Module 7: Lookups · Lesson 41 of 46
INDEX + MATCH
Combine INDEX and MATCH to find the hour of peak load.
Step 1 of 20%
A utility needs to know when its system peaks. In E1, find the peak load.
Target: E1
A1
| A | B | C | D | E | F | |
|---|---|---|---|---|---|---|
| 1 | Hour Ending | Load (MW) | Peak load (MW) | |||
| 2 | 12 | 1120 | Hour of peak | |||
| 3 | 13 | 1185 | ||||
| 4 | 14 | 1240 | ||||
| 5 | 15 | 1310 | ||||
| 6 | 16 | 1365 | ||||
| 7 | 17 | 1402 | ||||
| 8 | 18 | 1388 | ||||
| 9 | 19 | 1340 | ||||
| 10 | 20 | 1275 | ||||
| 11 | 21 | 1190 | ||||
| 12 | 22 | 1105 | ||||
| 13 | 23 | 1030 | ||||
| 14 | ||||||
| 15 | ||||||
| 16 | ||||||
| 17 | ||||||
| 18 | ||||||
| 19 | ||||||
| 20 | ||||||
| 21 | Hour of peak | |||||
| 22 |